Bruno
GA Member
- Jul 1, 2018
- 2,530
TYPE | Infrastructure |
COUNTRY | Spain |
PROJECT | Rebuilding Granxa Industrial Polygon |
PROJECT COST | 800,000,000.00 |
COMPLETION DATE | 27/11/2020 |
PROJECT INFORMATION | Rebuilding Granxa Industrial Polygon, after it suffered a fire and the explosion, all factories, companies and other buildings that were lost will be rebuilt to bring the same level of employment to before the fire, however it will be expanded with more industry and manufacturing plants, which will produce clothing,textiles and metal objects. Construction materials will be fireproof, with various fire fighting systems in place as to not repeat the past. The Industrial Complex will be less clustered, and more grid like, with open spaces between companies, alongside large roads. A Fire station will be stationed nearby as well as a small hospital and a helicopter field. Better connections to the Spanish Highways will be provided to keep the traffic flowing efficiently. This would ensure that jobs lost would be recuperated and more job openings will be available. As well as reinforcing Spanish Industrial Might. |
PRIVATE / ENCRYPTED | No |