STATISTICS

Start Year: 1995
Current Year: 2004

Month: February

2 Weeks is 1 Month
Next Month: 31/03/2024

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: Vacant


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

[Taiwan]: Meeting at Nigeria

  • Thread starter Deleted member 5
  • Start date
D

Deleted member 5






Taiwanese Foreign Minister, Mr. Joseph Wu would casually asks to Nigerian Vice President Adetokunbo Kayode, "When do you like to start the project, so that we can build Future Nigeria 2020-2030. We would like to build Nuclear Power Plant and Solar Energy Plant. After that we would like to build hospitals with full of Taiwanese Technology. We can build Nigeria Military Aviation Industry. What do you think? We will start as you will commence the project."
 

JJSmithJr

Senior
Jul 1, 2018
924
"We would need to have an official document and funding plan for such a plan. We would plan on completing the power plant much earlier than 2020."
 
D

Deleted member 5

"It would be completed before 2020. Apart from powerplant and infrastructure, we would like to offer domestic production rights CM-12 Main Battle Tank, Kung Feng Multiple Launch Rocket System, Thunderbolt-2000, F-CK-1 A/B Ching-kuo for your armed forces. Apart from these aircraft and armed materials, we can provide you some equipments for your air defense. We can offer domestic production rights for Mobile Phased Array Radar & Sky Bow III SAM. Sky Bow III is an equivalent system of THAAD. It can intercept Ballistic Missile. If you want we can offer land warfare equipments such as main battle tanks, apc. Do you agree with the offer?”
 
Last edited by a moderator:

JJSmithJr

Senior
Jul 1, 2018
924
"We are now prepared to immediately receive your nuclear engineers and construction teams to begin construction on the planned nuclear plant. We would be happy to recieve them in Abuja to discuss locations and necessary costs for the construction as well as the time it would take to complete the plant. Further we would like to see your specific planned construction projects to help further Nigeria into the modern age. We would be very happy to hear these plans."
 
D

Deleted member 5

As Foreign Secretary, Mr. Wu would check on the tablet regarding the nuclear power plant project and estimated cost. He would show to Vice President of Nigeria. He would speak.

"I have an solid idea about building 2 more nuclear plant at Abuja and Lagos. Abuja Nuclear Plant will cost $500 million and Lagos Nuclear Plant will cost $500 million. Abuja Nuclear Plant will provide 2700 MW of energy and Lagos Nuclear Plant will provide 2400 MW of Energy. This will provide more energy across the Nigeria and commerce will boost. Apart from nuclear energy plant, we will willing to sell more equipment to Nigerian Armed Forces and Taipei Defense Inc is always at your service."
 

JJSmithJr

Senior
Jul 1, 2018
924
"Are these costs your investments or the investments from Nigeria? Certainly they do not cover the entire costs of both plants. We have calculated the cost to at least one billion per plant, if not more when all costs are calculated together.

Further we are interested in whether or not your nation has the capablity to mine Uranium, as we have massive natural stocks here in Nigeria, but we totally lack the ability to exploit them. Such ability would enhance our power potential as well as expand our export industry."
 

Todays Birthdays

Forum statistics

Threads
21,282
Messages
103,676
Members
351
Latest member
jadebecoolwoof
Top