STATISTICS

Start Year: 1995
Current Year: 2007

Month: March

2 Weeks is 1 Month
Next Month: 24/08/2025

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: ManBear


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

Jamie

Admin
GA Member
World Power
Jan 6, 2018
13,504

Project Name: Power Shield UK: National Energy Resilience Program

Budget: $20bn

Objective: Deploy a rapid-response, nationwide network of modular microgrids to strengthen the UK’s energy resilience, reduce outage risks, and support renewable integration.

1. Strategic Goals
  • Energy Resilience: Ensure uninterrupted power to critical infrastructure (hospitals, water treatment plants, emergency services) during grid failures.
  • Regional Equity: Deliver energy support to rural and underserved communities.
  • Emergency Preparedness: Establish a permanent, flexible backup power system ahead of extreme weather, cyberattacks, or geopolitical disruptions.

2. Project Scope
  • Technology
    • 40ft containerised modular microgrids, each with;
      • Solar PV arrays (expandable on-site),
      • Battery Energy Storage System,
      • Smart interverters & control systems.
    • Plug-and-play grid connection hardware.
  • Scale
    • Approx. 3,000-4,000 units nationwide, strategically positioned for regional coverage.

3. Timeline
  • Week 0
    • Launch project, announce public/private manufacturing contracts,
    • Mobilise logistics partners (e.g., Network Rail freight, private hauliers),
    • Pre-identify Tier 1 priority sites (NHS hospitals, water facilities, military bases).
  • Week 1-2
    • Transport and install units at Tier 1 sites (approx. 1,500 units),
    • Simultaneously begin Tier 2 installations (local government offices, telecom hubs, food distribution centres).
  • Week 2-3.5
    • Complete Tier 2 installations (approx. 1,500–2,500 units),
    • Commission systems, conduct load testing,
    • Establish national monitoring centre for remote performance tracking.

4. Budget

CategoryAllocation (Bn)Notes
Manufacturing of microgrids12Bulk order of modular units with renewables + storage
Logistics & Deployment3.5Transport, cranes, site preparation
Grid Integration & Testing2Local coordination, connection fees
Monitoring & Control Infrastructure1National control centre, software systems
Contingency & Risk Reserve1.5Spare units, unforeseen costs

5. Outcome
  • All priority Tier 1 sites operational with microgrids within 3.5 weeks,
  • Reduction in critical infrastructure outage time to near-zero in first year,
  • 20–25% renewable contribution from deployed microgrids,
  • Demonstrated capability to redeploy units during emergencies within 48 hours.

Confidentiality Notice: This document and its contents are strictly confidential and intended solely for authorised personnel involved in the Power Shield UK: National Energy Resilience Program. Unauthorized disclosure, copying, distribution, or use of this information is strictly prohibited.
 