Nathan
GA Member
- Jul 2, 2018
- 736
TYPE | Infrastructure |
CLIENT | Iraq |
PROJECT | Um Qasr Naval Base |
PROJECT COST | 10,000,000,000.00 |
COMPLETION DATE | 11/06/2024 |
PROJECT INFORMATION | Um Qasr Naval base - see my maps on deployments for outline Base will include; A Dry Dock Suitable accommodation for 30,000 men, with family accommodation A training school for enlisted Officer Training School Marine base/Training grounds A mosque Navy Police HQ Military Working Dogs kennels Shopping mall 6 Helipads and aircraft maintenance services. 1 New port area with ship berthing for up to 30 vessels, ranging in size from patrol boat to aircraft carrier Secondary port area - designed to be able to be separated from the main Iraqi base for foreign navy rentals - this area will have a interior perimeter wall and guard posts - when not in use by a foreign navy it will operate as a secondary base. Extensive dredging will allow 15 vessels to be based here. - up t0 2,000 troops can be accommodated in this area Third port area - will include pontoons to allow a riverine force to be based at the area. A 800 bed Military Hospital - with burns, critical care and trauma operating capability. Air Defence firing points to North, South, East and West of base made. This will include elevated areas for long range radar. 20ft Perimeter fence, barbed wiring and guard posts around the perimeter. 3 Entry check points - to be heavily fortified with barricades and guard posts. The already existing Iraqi government port will be incorporated into the perimeter fence, allowing a 4th docking area. Extensive dredging/digging and land reclamation will be required. |
ENCRYPTED | Yes |