STATISTICS

Start Year: 1995
Current Year: 2005

Month: May

2 Weeks is 1 Month
Next Month: 10/11/2024

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: ManBear


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

[Project] Tanzania - National Railroad Expansion Project - Phases 1 and 2

Status
Not open for further replies.

Tuzi

Tanzania
Aug 30, 2020
187
TYPEInfrastructure
COUNTRYTanzania
PROJECTNational Railroad Expansion Project - Phases 1 and 2
PROJECT COST5,000,000,000.00
COMPLETION DATE16/12/20
PROJECT INFORMATIONRailroad expansion – phase 1: Modernising of current network and construction of major stations

-Revitalisation and electrification of all current rail networks (3570km)
-Doubling of all current single-track rail networks (3570km), enabling trains to travel in opposite directions simultaneously
-Upgrading all current rail tracks to heavy rail where such is not present already, enabling both freight and passenger traffic.
-Narrowing of the TAZARA railway line (970km), between Dar Es Salaam and Tunduma, to adhere to the accepted Tanzanian gauge width of 1000mm. This will lead to increased flexibility and efficiency of Tanzania’s rail infrastructure. A break-of-gauge will be constructed in Tunduma to maintain the Tanzania-Zambia Railway link.
-Construction of 18 platform station in Dar Es Salaam (507,000m2)
-Construction of 16 platform station in Dodoma (173,000m2)
-Construction of 12 platform station in Tabora (44,000m2)



Railroad expansion – phase 2: Connecting major population centres to the rail network

-Mtwara – Dar Es Salaam: electrified, double-track (574km) Estimated 200,000 people connected to the rail network.
Train Station with 11 platforms constructed in Mtwara (85,000m2). Mtwara aimed to be regional transport hub in Southern Tanzania and projected to construct first line linking Tanzania and Mozambique from this station.
Train Stations with 2 platforms constructed in 23 towns: Mikindani, Mingoyo, Lindi, Mbanja, Mchinga, Ruawa, Kitomanga, Mitole, Kiwawa, Kizimbani, Ukuli, Lingaula, Nangurukou, Kilwa Masoko, Kilwa Kivinje, Miteja, Matapatapa, Somanga, Marendego, Muhoro, Ikwiriri, Kibiti, Bungu,

-Songea – Mlimba: electrified, double-track (282km) Estimated 240,000 people connected to the rail network
Train Station with 6 platforms constructed in Songea (60,000m2)
Train Stations with 2 platforms constructed in 3 towns: Ngoharanga, Mgalimila, Mpanga,

-Mpanda – Sumbawanga – Tunduma: electrified, double-track (512km) Estimated 350,000 people connected to the rail network.
Train station with 6 platforms constructed in Mpanda (13,700m2) and Tunduma(15,200m2)
Train station with 5 platforms constructed in Sumbawanga(12,300m2)
Train station with 2 platforms constructed in 12 towns: Magamba, Sitalike, Kisi, Mwai, Mashete, Chala, Milundikwa, Nkundi, Ntendo, Kizwete, Tamasenga, Kalamazwite,


-Makambako – Mafinga – Iringa – Dodoma: electrified, double-track (487km) Estimated 1,310,200 people connected to the rail network.
Train station with 9 platforms constructed in Makambako (24,000m2)
Train station with 8 platforms built in Iringa (28,200m2)
Train stations with 2 platforms constructin in 17 towns: Nyororo, Matanana, Ifunda, Tanangozi, Ugwachanya, Kitwiru, Lugalo, Ismani, Luganga, Winza, Ikuyu, Kikbakwe, Berege, Mvumi Mission, Mvumi Makulu, Ntyuka, Mafinga


-Bukoba – Mwanza – Musoma: electrified, double-track (681km) Estimated 634,400 people connected to the rail network.
Train stations with 4 platforms constructed in Bukoba, Musoma and Geita
Train stations with 2 platforms constructed in 3 towns: Nyahanga, Lamadai, Bunda

Map: https://www.google.com/maps/d/edit?mid=19ojw4NG5tYU0CvXGWEUiVijZqkMRWdqA&usp=sharing
PRIVATE / ENCRYPTEDNo
 

Odinson

Moderator
GA Member
World Power
Jul 12, 2018
9,805
NATIONAL ECONOMICSValidated
QUALITY ASSURANCE PASSED
 

Jamie

Admin
GA Member
World Power
Jan 6, 2018
12,495
NATIONAL ECONOMICSInvoiced
THIS THREAD HAS BEEN MOVED
 
Status
Not open for further replies.

Latest posts

Forum statistics

Threads
22,130
Messages
108,334
Members
374
Latest member
DukeofBread
Top