TYPE | Infrastructure |
BUILDER | Tanzania |
CLIENT | Tanzania |
SITE LOCATION | Tanzania |
SECTOR | Business |
PROJECT NAME | Tanzania Comprehensive National Steel Development Initiative |
PROJECT COST | 3,105,000,000.00 |
COMPLETION DATE | 01/09/2025 |
PROJECT INFORMATION | Tanzania Comprehensive National Steel Development Plan This plan creates the full industrial backbone for Tanzania's steel sector by:
Industries Targeted:
Total combined cost of all sub-projects: $3,105,000,000 (Adjusted for PPP) Steel
Four steel plants built across Tanzania to produce a total target of 3.0M tonnes/year Integrated Steel Plant (ISP) Construction of two ISP’s, one in Mbeya, one in Tanga Production Capacity: 1.2 million tonnes/year finished steel each Products: rebar, wire rod, structural sections, hot-rolled coil (HRC) Plant Units & Facilities:
Mini Steel Plants (MSP) Construction of two, one in Morogoro, one in Kigoma Production Capacity: 300,000 tonnes/year each Focus on long products (rebar, wire rod, angles, flat bars) Plant Units & Facilities:
Estimated Jobs Created: Direct: 6,700 Indirect: 12,000 Ripple: 11,500 Total Cost: $2,200,000,000 Coking Coal & Metallurgical Coal
Development of coking coal mines in the Ruvuma province. Construction of a coal beneficiation & coking plant in Songea. Construction Specifications:
Estimated Jobs Created: Direct: 1,200 Indirect: 2,000 Ripple: 1,500 Total Cost: $180,000,000 Alloying Materials
Development of an alloy processing plant for blending and packaging in Dodoma Mining of Mn/Cr not currently viable domestically. Focus on processing imported ores. Construction Specifications:
Estimated Jobs Created: Direct: 250 Indirect: 400 Ripple: 300 Total Cost: $40,000,000 Limestone & Quarry Expansion
Upgrade of limestone quarries in Tanga, Lindi and Mbeya Installation of on-site crushing & calcination plants Construction Specifications:
Estimated Jobs Created: Direct: 600 Indirect: 1,200 Ripple: 800 Total Cost: $75,000,000 Heavy Machinery & Industrial Tooling Fabrication
Development of a Heavy Engineering Industrial Park in Kibaha. Capacity to house 280 industries. Construction Specifications: 10km2 industrial park with:
Estimated Jobs Created: Direct: 100,000 Indirect/Ripple: 500,000 Total Cost: $320,000,000 Industrial Gases
Development of two Air Separation Units (ASUs): one in Tanga, one in Mbeya Construction Specifications:
Estimated Jobs Created: Direct: 300 Indirect: 500 Ripple: 400 Total Cost: $110,000,000 Skilled Labour & Metallurgy Training Infrastructure
Upgrade University of Dar es Salaam (UDSM) and Mbeya University of Science and Technology. Construction of 3 new National Metallurgical & Industrial Training Institutes (NMITIs) in Dar es Salaam, Mwanza and Mbeya. Increase student enrolment capacity by 2,950 students per year in relevant programs. Construction Specifications:
Estimated Jobs Created: Direct: 500 Indirect: 1,000 Ripple: 800 Total Cost: $120,000,000 Steel Scrap Collection & Recycling Network
Formalise scrap collection with 15 regional collection centres and a national steel scrap marketplace platform Construction Specifications:
Estimated Jobs Created: Direct: 1,000 Indirect: 2,000 Ripple: 1,500 Total Cost: $60,000,000 |
ENCRYPTED | No |