- Sep 26, 2020
- 1,174
| TYPE | Infrastructure |
| BUILDER | Ukraine |
| CLIENT | Ukraine |
| SITE LOCATION | Ukraine |
| SECTOR | Facility |
| PROJECT NAME | The National Industrial Post-Soviet Modernization Program Act Of 2008: Phase I – Stabilization & Safety |
| PROJECT COST | 3,100,000,000.00 |
| COMPLETION DATE | 01/06/2026 |
| PROJECT INFORMATION | The National Industrial Post-Soviet Modernization Program Act Of 2008 Phase I – Stabilization & Safety The following factories are set for the first phase of overhauls and new installations. Factories: Donetsk Metallurgical Plant Yenakiieve Iron & Steel Works Kramatorsk Machine-Building Plant Donetsk Chemical Reagents Factory Horlivka Nitrogen Derivatives Plant Dnipro Metallurgical Combine Kryvyi Rih Mining & Ore Processing Combine Yuzhmash Aerospace Machine Plant Pavlohrad Chemical Plant Zaporizhstal Steel Plant Motor-Sich Aviation Engine Plant Zaporizhzhia Aluminium Refinery Malyshev Tank & Machine Plant Turboatom Turbine Engineering Kharkiv Tractor Plant Black Sea Shipyard (Mykolaiv) Okean Shipyard Odesa Port Machinery Plant Kyiv Electrical Equipment Combine Aviation Instrumentation Plant Chernihiv Plastics & Polymers Combine Industrial Safety Overhaul Gas leak detection Fire suppression systems Structural audits Total funds allocated: $1.0B Emergency Machinery Replacement 38 Obsolete furnaces to be replaced. 290 Chemical pressure vessels to be replaced 25 Heavy cranes & conveyor systems to be replaced. Total Funds allocated: $1.2B Environmental Compliance Initiatives Newly installed Filtration and dust suppression systems to be installed. New Liquid waste containment systems to be installed. Total funds allocated: $600M Workforce Safety & Certification Training Total funds allocated: $300M Employment Impact Survey: ~60,000 temporary jobs ~20,000 long-term retained jobs at stabilized plants |

