STATISTICS

Start Year: 1995
Current Year: 2005

Month: April

2 Weeks is 1 Month
Next Month: 27/10/2024

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: ManBear


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

BUYING Denmark | Electronic Tendering Service

JamieA

Kingdom of Denmark
GA Member
Oct 3, 2018
2,429


Electronic Tendering Service





PROJECT AF001 - Air to Air Refueling Contract

STATUS
OPEN
ACCESS
PUBLIC



PROJECT N001 - Submarine Contract

STATUS
OPEN
ACCESS
PUBLIC



PROJECT N002 - Replenishment Vessel Contract

STATUS
OPEN
ACCESS
PUBLIC

Code:
[dr][/dr][document][hr][/hr][center][img2=220]https://www.fmi.dk/globalassets/fmi/billeder/artikel/-fmi-kronelogo-2024-artikel.png[/img2][/center][hr][/hr][b]Reference[/b] 
INSERT PROJECT NAME & NUMBER

[b]Contractor Name[/n]
Insert

[b]Projected Costs[b]
Sub-Total = $0.00
VAT - $0.00
Discount - $0.00
Total - $0.00


[b]Optional Extras[/b]
INSERT

[b]Project Details[/b]
INSERT

Submission Date
MM/YYYY

[b]Signature[/b]
INSERT[hr][/hr][/document][dr][/dr]

© Denmark​

 

Basedcnt

GA Member
May 24, 2024
377



Reference
PROJECT N002 - Replenishment Vessel Contract

Contractor Name
Gandhi Empire - Mazagon Dock Shipbuilders (SOE)

Projected Costs
Sub-Total = $60,000,000.00
VAT - $5,000,000.00
Discount - $9,000,000.00 / 3-ship block
Total -
$65,000,000.00 / ship for <2 ships
$62,000,000.00 / ship for 3+ ships

Optional Extras
N/A

Project Details
General characteristics
Name: Deepak-class Oiler
Type: Tanker
Displacement: 15,000 tons
Length: 168 m (551 ft)
Beam: 23 m (75 ft)
Speed: 18.5 knots (34.3 km/h; 21.3 mph)
Complement: 169
Weapons: 1 x twin 40mm Bofors, 4 x 12.7mm Crew-Served Weapon
Sensors: ELINT complex, surf. search/nav. RADAR

Submission Date
04/2005

Signature
Department Head George Fernandes, Defence Department, Gandhi Empire



JamieA
 
Last edited:

Basedcnt

GA Member
May 24, 2024
377



Reference
PROJECT N002 - Replenishment Vessel Contract

Contractor Name
Gandhi Empire - Garden Reach Shipbuilders and Engineers (SOE)

Projected Costs
Sub-Total = $300,000,000.00
VAT - $15,000,000.00
Discount - $9,000,000.00 / 3-ship block
Total -
$315,000,000.00 / ship for <2 ships
$312,000,000.00 / ship for 3-ship block

Optional Extras
N/A

Project Details
General characteristics
Name: Aditya-class Auxiliary Ship
Type: Replenishment and Repair Ship
Displacement: 24,612 tons full load
Length: 172 m (564 ft)
Beam: 23 m (75 ft)
Draft: 7.5 m (25 ft)
Propulsion: 2 × ECR MAN B&W 16V 40/45 diesel engines with 23,972 hp (17,876 kW) sustained, 3 × 500 kW generators, 2 × 1500 kW power take-off shaft generators
Speed: 20 knots (37 km/h)
Range: 10,000 mi (16,000 km) @ 16 knots (30 km/h)
Complement: 191 + 6 aircrew (incl. 3 pilots)
Armament: 1 × SA-N-10 SAM launcher with 24 missiles, 3 × 2A42 30mm Medak guns
Sensors: surf. search/nav. RADAR
Aircraft carried: 1 × light-medium helicopter

Submission Date
04/2005

Signature
Department Head George Fernandes, Defence Department, Gandhi Empire



JamieA
 
Last edited:

Latest posts

Forum statistics

Threads
22,018
Messages
107,906
Members
373
Latest member
William Company
Top