STATISTICS

Start Year: 1995
Current Year: 2004

Month: April

2 Weeks is 1 Month
Next Month: 28/04/2024

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: Vacant


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

[Project] Angola - Caculo Cabaça Hydropower Plant

Status
Not open for further replies.

Tano

Kazakhstan
Mar 3, 2022
159
TYPEInfrastructure
COUNTRYAngola
PROJECT Caculo Cabaça Hydropower Plant
PROJECT COST3,800,000,000.00
COMPLETION DATE30/11/2022
PROJECT INFORMATION






*Artists impression​


The Caculo Cabaça hydropower plant project is a 2,172MW run-of-the-river hydroelectric facility under construction in Kwanza Norte Province of the Southern Africa country, approximately 19 kilometers upstream of the Laúca hydropower station and 270 kilometers east of Angola’s capital city Luanda.

The project comprises the construction of a 103m-high concrete dam with a crest length of 553 meters. The maximum length of the reservoir will be 16.3 kilometers and an area of 16.6 km2 will be inundated. The dams’ storage capacity of 440 million cubic meters.

The dam’s hydraulic structure includes a controlled frontal spillway with five radial gates and a flow rate of 10.02m3/s. The bottom outlet of the structure is formed by two-lined tunnels while its central body comprises two saddle dams, closed by concrete weirs, 525m and 192m long, and 36m and 4m wide respectively.

The water intake structure for the Caculo Cabaça hydropower plant will be located about 2.4 kilometers upstream of the dam’s left abutment.

The project also involves the construction of an underground powerhouse equipped with four 530MW turbine-generator units, as well as a 52MW ecological power plant situated adjacent to the dam.

An estimated 10,000 workers are expected to be hired during the construction phase.
PRIVATE / ENCRYPTEDNo
 

Odinson

Moderator
GA Member
World Power
Jul 12, 2018
9,415
NATIONAL ECONOMICSValidated
QUALITY ASSURANCE PASSED
 

Jamie

Admin
GA Member
World Power
Jan 6, 2018
11,773
NATIONAL ECONOMICSInvoiced
THIS THREAD HAS BEEN MOVED
 
Status
Not open for further replies.

Forum statistics

Threads
21,570
Messages
104,953
Members
364
Latest member
Jvasa
Top