STATISTICS

Start Year: 1995
Current Year: 2005

Month: January

2 Weeks is 1 Month
Next Month: 01/09/2024

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: Vacant


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

[Project] Iraq - Presidential Palace upgrades

Nathan

GA Member
Jul 2, 2018
719
TYPEInfrastructure
CLIENTIraq
PROJECTPresidential Palace upgrades
PROJECT COST2,000,000,000.00
COMPLETION DATE16/08/2024
PROJECT INFORMATIONThe Presidential Palace will receive an upgrade. The perimeter will be reinforced with secure fencing, and new reinforced guard posts erected at the entrances/exits. Motion sensors will cover the grounds leading to the palace and high definition cameras.

Inside, a new cabinet room will be created as well as an office for news reporters and press room. The office will have a guard position at the exit and cctv to prevent press entering secure areas of the palace. A new Presidential office will be created, soundproofed to the outside. New encrypted and unencrypted phone lines will be installed. Each exterior window will be replaced with bulletproof glass. Concealed but reinforced cover positions will be created for sniper positions. A bowling lane and a revamped banquet hall will be installed as well as a small cinema

Underground, a 5000 square feet two story bunker will be created at basement and newly created -2 floor underneath the basement, hosting the situation room. This bunker will host a diner with kitchen facilities, a conference room, various private offices, private booths, a intelligence monitoring room with computers for intelligence analysts and video conferencing technology. Secure phone lines will be installed to ensure all information is communicated securely.

Further underground, a emergency bunker will be created. Deep enough to withstand a direct hit from a 20,000 ib bomb. It will be fitted with HVAC equipment to seal it from the outside air, recycling it's own air to contain it from possible chemical attacks. It will be equipped with its own power generator and water treatment plant. Space will include a kitchen, military planning and conference room with secure teleconferencing and a Presidential office. A private presidential bedroom and a separate large dorm style sleeping area will be installed. It will feature a conference room with secure phone lines and a large storage room with refrigerator, freezer and supplies for 6 months. Access is gained via an elevator or emergency staircase.
ENCRYPTEDYes
 
Last edited:

Latest posts

Forum statistics

Threads
21,917
Messages
107,292
Members
370
Latest member
asaktih
Top