STATISTICS

Start Year: 1995
Current Year: 2007

Month: June

2 Weeks is 1 Month
Next Month: 05/10/2025

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: ManBear


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

[Project] Petrobras + Government Agencies - Pré-Salt 2007 - Phase I

Kane

GA Member
Aug 28, 2025
62
TYPEInfrastructure
BUILDERPetrobras + Government Agencies
CLIENTRepublica Federativa do Brasil
SITE LOCATIONBrazil
SECTOREnergy
PROJECT NAMEPré-Salt 2007 - Phase I
PROJECT COST4,500,000,000.00
COMPLETION DATE01/11/2025
PROJECT INFORMATIONDESCRIPTION

Brazil’s 2007 pre-salt discovery is a strategic inflection point. Phase I launches a disciplined, lower-capex path to early monetisation while building the foundations for a larger multi-FPSO hub. This phase concentrates on one full-scale FPSO rated at ~150 kbpd (with gas handling), the essential wells and subsea network, and a lean midstream solution. The approach balances speed with HSE excellence, local-content ramp-up, and robust sovereign-fund governance to convert resource wealth into long-term national capacity (education, R&D, energy transition).

SCOPE OF WORKS

Subsurface & Appraisal Advanced 3D/4D seismic refresh; 3–4 appraisal wells; reservoir models and development plan for the initial production area. First Production System 1× FPSO (~150 kbpd) with gas treatment/handling; producer & injector wells; subsea package (trees, manifolds, umbilicals, risers, flowlines) sized for Phase I and prepared for future tie-ins.

Early Midstream Minimal export solution (pipeline spur and/or temporary FSO offloading), custody metering and shore tie-in sufficient for Phase I volumes. Gas reinjection or limited offtake to minimise flaring.

Industrial & Logistics Setup Module-integration slots at domestic yards; readiness of Macaé/Vitória logistics; OSV/AHTS fleet and offshore helicopter support; ROV capability for inspection/intervention.

Governance, Social & Environmental Standing up the Pré-Sal Sovereign Fund framework; full EIA/RIMA; Oil Spill Response (Tier 1–3); continuous metocean and environmental monitoring; structured community engagement.

BUDGET (by work package, USD 2007, estimate)

--Subsurface (seismic refresh, appraisal wells, studies): $600,000,000

--FPSO-1 (~150 kbpd): hull conversion/newbuild, topsides and integration: $1,700,000,000

--Drilling & Completions (producers/injectors): $1,350,000,000

--Subsea equipment & lines (trees, manifolds, umbilicals, risers/flowlines): $500,000,000

--Early Midstream (pipeline spur / temporary FSO, metering, shore tie-in): $250,000,000

--HSE, environmental & social programmes: $75,000,000 Logistics setup (bases, OSV/heli mobilisation, ROV availability): $100,000,000

--Contingency (balanced across packages): $75,000,000

----TOTAL: $4,500,000,000

EXPECTED OUTCOMES

Production: Nameplate ~150 kbpd for FPSO-1 (actual output subject to availability/uptime).

Indicative gross revenues @ $60/bbl: ≈ $3.285B per year at nameplate (availability factor scales results).

Industrial & Jobs: ≥50% local content (Phase I baseline), stepping up in subsequent phases; ~15–30k direct+indirect jobs at peak build.

HSE & ESG: Minimal flaring; CO₂ reinjection where feasible; zero major incidents; independent HSE audits; transparent reporting through the sovereign-fund governance.

IMPLEMENTATION

Governance: Petrobras as lead operator under an inter-ministerial steering arrangement; quarterly public reporting; independent audit of the Pré-Sal Sovereign Fund.

Procurement: Competitive RFPs for FPSO-1, Subsea Package-1, drilling services, OSV/heli support and early midstream; binding local-content and technology-transfer clauses.

Risk Management: HP/HT and CO₂ managed via conservative design and redundancy; multi-vendor frameworks for supply-chain resilience; partial price-risk hedging (collars).

Readiness & Integration: Alignment of yard capacity and long-lead items; logistics base commissioning; OSR capability validated; metering and integrity assurance in place for first liftings.

GLOSSARY

- FPSO — Floating Production, Storage & Offloading: floating unit that processes, stores, and offloads crude offshore.

- FSO — Floating Storage & Offloading: floating unit for storage/offloading without processing.

- kbpd — thousand barrels per day: production flow rate unit.

- bbl — barrel: oil volume unit (~159 liters).

- HSE — Health, Safety & Environment: operational safety and environmental management.

- ESG — Environmental, Social & Governance: transparency and sustainability criteria beyond HSE.

- EIA/RIMA — Environmental Impact Assessment / Relatório de Impacto ao Meio Ambiente (Brazil): impact study and formal report required by Brazilian law.

- OSR (Tier 1–3) — Oil Spill Response: spill-response capability levels from local (Tier 1) to regional/national (Tier 3).

- OSV — Offshore Support Vessel: offshore logistics/support ship.

- AHTS — Anchor Handling Tug Supply: anchor-handling/supply tug for offshore units.

- ROV — Remotely Operated Vehicle: tethered underwater vehicle for inspection/intervention.

- RFP — Request for Proposals: competitive procurement/tender notice.

- HP/HT — High Pressure / High Temperature: demanding reservoir conditions.

- CO₂ — Carbon Dioxide: often re-injected in pre-salt fields for gas management/EOR.

- Metocean — Meteorological & Oceanographic (data): wind, waves, currents and related offshore conditions.

- Custody metering — Fiscal measurement at the custody transfer point for oil/gas.

- RJ / SP / ES — Rio de Janeiro / São Paulo / Espírito Santo: Brazilian states hosting onshore support/terminals.

- USD — United States Dollar: project currency.
 

ManBear

Moderator
GA Member
World Power
May 22, 2020
2,722
◤ NATIONAL ECONOMY SYSTEM
Your transaction has been audited and found to be in accordance with quality control standards.
 

Latest posts

Forum statistics

Threads
23,878
Messages
116,003
Members
416
Latest member
FloraC1007
Top