STATISTICS

Start Year: 1995
Current Year: 2005

Month: May

2 Weeks is 1 Month
Next Month: 10/11/2024

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: ManBear


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

[Project] Sweden - Cape Hooker Black Site

Status
Not open for further replies.

Connor

Kingdom of Sweden
Moderator
GA Member
Jul 23, 2018
4,221
TYPEInfrastructure
COUNTRYSweden
PROJECTCape Hooker Black Site
PROJECT COST10,000,000.00
COMPLETION DATE04/02/2023
PROJECT INFORMATIONDepartment for Home Affairs
National Security Office
Cape Hooker Prison (Black Site)

DESCRIPTION
The Department for Home Affairs has authorised, at the highest possible level, the construction of a black site prison in order to interrogate individuals, organisations and networks that are suspected of being responsible for, planning or capable of an act of terror within the Kingdom of Sweden or territory of her allies. This facility will be constructed purely to detain and interrogate enemy combatants. The status of these sites has long been in international disrepute given the ethical and legal complications of their existence; thus Cape Hooker will be a covert facility, unidentifiable from the exterior.

LOCATION
Marion Island, Cape Hooker
-46.978403, 37.829829

FACILITIES
From the exterior the site will appear to be nothing other than a military installation, a short distance from the multi-branch operational Marion Island military facility. The placement is strategic as to divert any suspicion.
- Administrative Section
- Cell Wing (x15)
- Wet Room (x3)
- Sensory Deprivation Hold (x3)
- Communications and Security Centre
- Resource Storage
- Helicopter Landing Pad
- Air Traffic Control Office
- Vehicle Parking Lot

SECURITY
As standard the facility will be covered with secure CCTV networks to minimise blind spots on the exterior and prioritise high security areas within any buildings or facilities. The perimeter is covered by motion sensors to identify any potential breach. Internal doors are steel and controlled by the Communications and Security Centre at all hours. All buildings, hangers and facilities are secured by gateway pass doors supplied and activated by the Swedish Department of Home Affairs and Defence only. A barbed razor wire topped reinforced concrete wall surrounds the facility and any external monitoring positions. Adequate road and pedestrian networks surround and allow travel within the base. Any vehicle gates are secured by recessed traffic control measures. The property is sound proof. All windows looking into the site and one-way from the interior. There is no external signage of any significant other than those indicating no unauthorised access. Emergency back up generators secure the supply of electricity, gas, water and sewage if necessary. Internal burglary and fire alarm and suppression systems installed.
PRIVATE / ENCRYPTEDYes
 
Last edited:

Jamie

Admin
GA Member
World Power
Jan 6, 2018
12,499
NATIONAL ECONOMICSValidated
QUALITY ASSURANCE PASSED
 

Jamie

Admin
GA Member
World Power
Jan 6, 2018
12,499
NATIONAL ECONOMICSInvoiced
THIS THREAD HAS BEEN MOVED
 
Status
Not open for further replies.

Latest posts

Todays Birthdays

Forum statistics

Threads
22,189
Messages
108,702
Members
375
Latest member
drex
Top