STATISTICS

Start Year: 1995
Current Year: 2005

Month: May

2 Weeks is 1 Month
Next Month: 10/11/2024

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: ManBear


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

[Project] Thailand - BTS Skytrain

Status
Not open for further replies.

Bossza007

I am From Thailand
GA Member
World Power
May 4, 2021
2,886
TYPEInfrastructure
COUNTRYThailand
PROJECTBTS Skytrain
PROJECT COST495,000,000.00
COMPLETION DATE05/12/2021
PROJECT INFORMATIONBTS

Bangkok is growing in population and tourists, if there continues to be an ever-increasing increase in the amount of traffic on the road it generates a traffic jam more often.

This Bangkok train station is a plan first launched in the early 1980s. The Lavalin Skytrain is an early version of the Skytrain project which is based on the Vancouver SkyTrain and is using the SNC-Lavalin technology.
The First plan was canceled in June 1992 because of political interference.

The structure of the Train runway is an elevated road (Viaduct) placed on a single post. Which is generally built on an island in the middle of the road This elevated walkway is approximately 9 meters wide and 12 meters high above the ground. It is a piece of pre-cast concrete (Segment) assembled one column at a time. (Span-by-Span) with a dry joint and fastened with high-tensile wire external (External Post-Tensioning) within the gap of the segment, the reason for choosing this construction system This is because the method is quick to install and avoids congested traffic in the city. Approx. 2 meters wide, with a distance of around 30 - 35 meters, is used to support the elevated concrete walkway.

The BTS Skytrain from Mo Chit to On Nut, known as the Sukhumvit Line, and from National Stadium to Saphan Taksin, known as the Silom Line, will be built at the Bangkok Train Station.

The train's top speed will be limited to 80 km/h, with a top speed of 90 km/h in an unusual scenario.

The Sukhumvit Line will have a length of 31.72 kilometers(round-trip distance) and 18 stations.
The length of the Silom Line will be 12.50(round-trip distance) kilometers, with seven stations.
The total length will be 44.22 kilometers, with 25 stations.
The landowner will provide and store for anyone to rent and start their business in each station. The construction cost will be to be $495 million.
PRIVATE / ENCRYPTEDNo
 

Connor

Kingdom of Sweden
Moderator
GA Member
Jul 23, 2018
4,193
NATIONAL ECONOMICSValidated
QUALITY ASSURANCE PASSED
 

Jamie

Admin
GA Member
World Power
Jan 6, 2018
12,495
NATIONAL ECONOMICSInvoiced
THIS THREAD HAS BEEN MOVED
 
Status
Not open for further replies.

Latest posts

Forum statistics

Threads
22,127
Messages
108,330
Members
374
Latest member
DukeofBread
Top