STATISTICS

Start Year: 1995
Current Year: 2007

Month: June

2 Weeks is 1 Month
Next Month: 05/10/2025

OUR STAFF

Administration Team

Administrators are in-charge of the forums overall, ensuring it remains updated, fresh and constantly growing.

Administrator: Jamie
Administrator: Hollie

Community Support

Moderators support the Administration Team, assisting with a variety of tasks whilst remaining a liason, a link between Roleplayers and the Staff Team.

Moderator: Connor
Moderator: Odinson
Moderator: ManBear


Have a Question?
Open a Support Ticket

AFFILIATIONS

RPG-D

INVOICE REQUIRED [Project] United Kingdom - Power Shield UK

Jamie

Admin
GA Member
World Power
Jan 6, 2018
13,620
TYPEInfrastructure
BUILDERUnited Kingdom
CLIENTUnited Kingdom
SITE LOCATIONUnited Kingdom
SECTOREnergy
PROJECT NAMEPower Shield UK
PROJECT COST20,000,000,000.00
COMPLETION DATE30/09/2025
PROJECT INFORMATION

Project Name: Power Shield UK: National Energy Resilience Program

Budget: $20bn

Objective: Deploy a rapid-response, nationwide network of modular microgrids to strengthen the UK’s energy resilience, reduce outage risks, and support renewable integration.

1. Strategic Goals
  • Energy Resilience: Ensure uninterrupted power to critical infrastructure (hospitals, water treatment plants, emergency services) during grid failures.
  • Regional Equity: Deliver energy support to rural and underserved communities.
  • Emergency Preparedness: Establish a permanent, flexible backup power system ahead of extreme weather, cyberattacks, or geopolitical disruptions.

2. Project Scope
  • Technology
    • 40ft containerised modular microgrids, each with;
      • Solar PV arrays (expandable on-site),
      • Battery Energy Storage System,
      • Smart interverters & control systems.
    • Plug-and-play grid connection hardware.
  • Scale
    • Approx. 3,000-4,000 units nationwide, strategically positioned for regional coverage.

3. Timeline
  • Week 0
    • Launch project, announce public/private manufacturing contracts,
    • Mobilise logistics partners (e.g., Network Rail freight, private hauliers),
    • Pre-identify Tier 1 priority sites (NHS hospitals, water facilities, military bases).
  • Week 1-2
    • Transport and install units at Tier 1 sites (approx. 1,500 units),
    • Simultaneously begin Tier 2 installations (local government offices, telecom hubs, food distribution centres).
  • Week 2-3.5
    • Complete Tier 2 installations (approx. 1,500–2,500 units),
    • Commission systems, conduct load testing,
    • Establish national monitoring centre for remote performance tracking.

4. Budget

CategoryAllocation (Bn)Notes
Manufacturing of microgrids12Bulk order of modular units with renewables + storage
Logistics & Deployment3.5Transport, cranes, site preparation
Grid Integration & Testing2Local coordination, connection fees
Monitoring & Control Infrastructure1National control centre, software systems
Contingency & Risk Reserve1.5Spare units, unforeseen costs

5. Outcome
  • All priority Tier 1 sites operational with microgrids within 3.5 weeks,
  • Reduction in critical infrastructure outage time to near-zero in first year,
  • 20–25% renewable contribution from deployed microgrids,
  • Demonstrated capability to redeploy units during emergencies within 48 hours.

Confidentiality Notice: This document and its contents are strictly confidential and intended solely for authorised personnel involved in the Power Shield UK: National Energy Resilience Program. Unauthorized disclosure, copying, distribution, or use of this information is strictly prohibited.
 

ManBear

Moderator
GA Member
World Power
May 22, 2020
2,722
◤ NATIONAL ECONOMY SYSTEM
Your transaction has been audited and found to be in accordance with quality control standards.
 

Latest posts

Forum statistics

Threads
23,878
Messages
116,003
Members
416
Latest member
FloraC1007
Top