- Jul 1, 2018
- 5,043
SECRET
OPPLAN - EAGLE
REFERENCE: OPLAN/2007/002
ISSUING AUTHORITY: CHIEF OF THE DEFENCE STAFF (CEMA)
DATE: MAY 2007
1. MISSION
A. COMMAND
2. ORBAT
Last updated: May 2007
A. PERSONNEL & ASSETS
3. EXECUTION
A. OPERATIONAL PHASES
SECRET
OPPLAN - EAGLE
REFERENCE: OPLAN/2007/002
ISSUING AUTHORITY: CHIEF OF THE DEFENCE STAFF (CEMA)
DATE: MAY 2007
1. MISSION
To provide layered air, maritime, land and close protection for the President of the United States (POTUS) while on French territory.
A. COMMAND
▪ Overall Command: Chief of Defence Staff (CEMA).
▪ Operational Command: Commander Task Force Eagle.
▪ Operational Command: Commander Task Force Eagle.
2. ORBAT
Last updated: May 2007
Commander Task Force Eagle
├── Commander Air & Space Force Detachment
├── Commander Air & Space Force Detachment
└── B Flight, 1/1 Fighter Squadron, 1st Fighter Wing
└── A Battery, 1st Air Defense Artillery Regiment, 1st Air Defence Brigade
└── B Battery, 1st Air Defense Artillery Regiment, 1st Air Defence Brigade
├── Commander Land Forces Detachment└── 1/1 Attack & Destruction Squadron, 1st Combat Helicopter Regiment
├── Commander Naval Detachment└── D620 Forbin
└── Commander Gendarmerie Detachment├── Intervention Force, National Gendarmerie Intervention Group
└── Security & Protection Force, National Gendarmerie Intervention Group
A. PERSONNEL & ASSETS
B Flight, 1/1 Fighter Squadron, 1st Fighter Wing
Operational Personnel: 30
Asset: [4] Dassault Rafale C
Asset: [4] Dassault Rafale C
A Battery, 1st Air Defense Artillery Regiment, 1st Air Defence Brigade
Operational Personnel: 50
Asset: [4] SAMP/T Launcher | [1] Ground Master 400
Asset: [4] SAMP/T Launcher | [1] Ground Master 400
B Battery, 1st Air Defense Artillery Regiment, 1st Air Defence Brigade
Operational Personnel: 50
Asset: [4] SAMP/T Launcher | [1] Ground Master 400
Asset: [4] SAMP/T Launcher | [1] Ground Master 400
1/1 Attack & Destruction Squadron, 1st Combat Helicopter Regiment
Operational Personnel: 30
Asset: [4] Eurocopter Tigre HAD
Asset: [4] Eurocopter Tigre HAD
D620 Forbin
Operational Personnel: 174
Asset: [1] Horizon-class Frigate
Asset: [1] Horizon-class Frigate
Intervention Force, National Gendarmerie Intervention Group
Operational Personnel: 40
Asset:
Asset:
Security & Protection Force, National Gendarmerie Intervention Group
Operational Personnel: 50
Asset:
Asset:
3. EXECUTION
A. OPERATIONAL PHASES
Phase I – Preparation & Deployment
Objective: Position forces and establish command, liaison, ISR and air defence coverage prior to the arrival of POTUS.
Objective: Position forces and establish command, liaison, ISR and air defence coverage prior to the arrival of POTUS.
Phase II – Arrival, Transit & Departure Operations
Objective: Provide full protective coverage during POTUS arrival, movements, and fixed-site visits and departure.
Objective: Provide full protective coverage during POTUS arrival, movements, and fixed-site visits and departure.
SECRET